[Industrial Biography by Samuel Smiles]@TWC D-Link bookIndustrial Biography CHAPTER II 19/25
Paul's Cathedral.
The contract was thought too large for one iron-master to undertake, and it was consequently distributed amongst several contractors, though the principal part of the work was executed at Lamberhurst, near Tunbridge Wells.
But to produce the comparatively small quantity of iron turned out by the old works, the consumption of timber was enormous; for the making of every ton of pig-iron required four loads of timber converted into charcoal fuel, and the making of every ton of bar-iron required three additional loads.
Thus, notwithstanding the indispensable need of iron, the extension of the manufacture, by threatening the destruction of the timber of the southern counties, came to be regarded in the light of a national calamity.
Up to a certain point, the clearing of the Weald of its dense growth of underwood had been of advantage, by affording better opportunities for the operations of agriculture.
<<Back Index Next>> D-Link book Top TWC mobile books
|